Friday, 27 June 2025

Scratchbuilt Winter Buildings Number Four and Five

Having been delayed three weeks by the arrival of a stock of epoxy putty, I have finally been able to complete the work on the thatched roofs and completed the basing on Winter Buildings Four and Five.

Building Four: the house...




...with its alternate roof option from Building One.


Building Five: the barn...





...with its alternate roof option from Building Two.


Still to come with this batch of buildings is a railway station which is a more complex build, but progressing well and should be completed over the weekend.

4 comments:

  1. These are great Mark! I have been working on terrain too, inspired by you, but mine are a dunbed down version...good enough for me but not up to your standards....now, I am thinking I should do some more and try to achieve the same level as you have!

    ReplyDelete
    Replies
    1. Thanks Keith. I have almost completed the railway station and it us looking spectacular. I have also started another four for another project.

      Delete
  2. Excellent Job. Looks the Biz-ness. 😁

    ReplyDelete