The first step was to cut out the base of the model.
The main sides were then cut from 3mm MDF and some from 3mm card, and assembled along with the base of the tower, the main door and the side exit.
With the base assembly complete and the glue set hard the lower 20mm was given a stone finish.
I am happy with the way the tower fits into the model.
Over the next few days I'll work on the fiddly bits - windows and door fittings before tackling the roof, which has a number or unique challenges.









No comments:
Post a Comment